Robert Rowley
9th December 2008, 05:01 AM
Hi Tony,
Do you have a way that can report the beams or cleat connection material for pricing purposes and the length of same so that I can send this list off to our steel stock holder?
of Course I would cross out the beams that I am connecting with (i.e existing developers beams) but this would still save me having to produce a list manually.
My list would warn the stock holder that we would need say 50mm extra for us to make the final cut.
Is this possible?
Bob